Alstom at Russia Power/HydroVision Russia 2011

Press Contacts

Visit our media section and follow the link "Press contacts"

Delivering benefits at every stage of your plant's life

Backed by in-depth plant knowledge, we provide cost-effective, quality solutions to take your competitiveness to the next level, today and in the future. Improving output and optimising the performance of your assets is our priority, from the initial plant concept, through its entire operating life. 

Clean Power Today! Stabilising power emissions with solutions available today 

Alstoms commitment to address the climate change challenge is a long-standing one. CO2-free and low-carbon technology development are our top priorities. We are ready to provide the solutions that will meet the worlds increasing demand for power, with a range of technologies that ensure higher efficiency and lower emissions, today!

Hydroelectricity- An Answer to Electricity Needs 

A leading force in hydropower, Alstom works with its customer locally to provide the best solutions to keep their plant up and running at peak performance for optimized investment payback. We offer retrofit and service solutions for all kinds of hydropower plants and  can retrofit any type of hydroelectric power station

Delivering benefits at every stage of your plants lifecycle 

Backed by in-depth plant knowledge, we provide cost-effective, quality solutions to take your competitiveness to the next level, today and in the future. Improving output and optimising the performance of your assets is our priority, from the initial plant concept, through its entire operating life.

Technical Tour 

Technical Tour to Mosenergo Combined Heat & Power Plant No. 26 (TPP-26), Moscow
Date: Wednesday 30th March 2011

Technical Presentations 

28 March 2011 

  • Development and integration of Alstom GT13E2 gas turbine at the Yerevan Thermal Power Plant (YTPP) in Armenia
  • (HYDROVISION) Technical and Logistical Challenges for Equipment manufacturers of New Hydro Plants in Northerly locations

29 March 2011 

  • (HYDROVISION) Session 4 Turbines
    Chair: Maryse François, VP Hydro R&D and Product Management
  • Effective strategy in EPC construction of 400 MW class combined cycle cogeneration power plant
  • Alstoms KA26 advanced class power island for combined cycle power plants
  • Steam turbine retrofit potential in Russian nuclear plant
  • Efficient Alstom solutions on turbogenerator retrofits for NPPs

30 March 2011 

  • Session 8 Lifetime Extensions
    Chair: Michael Ladwig, Technical Director Plant Business, Director Product Promotion, Alstom, Switzerland
  • Strategy of Integrated approach in modernization of boiler equipment and steam turbine of coal stations  (Alstom)
  • Experiences meeting ultra low emissions on coal fired Power Plants
  • (HYDROVISION) Rehabilitation of low & medium head large units : hydraulic and mechanical specificities