Northern Rail Class 323 overhaul completed by Alstom in Manchester

Press Contacts

Visit our media section and follow the link "Press contacts"

Alstom has completed work overhauling Northern Rails 17-strong Class 323 regional fleet to

help produce a modern fleet for commuters and the client, with more than 2,000 components exchanged.

The project was undertaken at Alstoms Longsight depot in Manchester, with two overhauls being taken on simultaneously.

The work undertaken on one project included bogies being exchanged, inter-vehicle couplers being overhauled, new gangways fitted and brake equipment exchanged. The rest of the work saw car floorboards and flooring replaced, seat shells refurbished and re-covered, and car heaters and train doors overhauled.

Northern Rails 323234 was the first of the Class 323s to be overhauled, and 323231 being the last to go through the process.

More than 2,000 components were exchanged on each three-car unit, with the work being undertaken by a dedicated team over a five week period.

Press contact 
Jonathan Smith, Head of Media Relations, Alstom UK
Tel 01788 545602 or 07801 775650
jonathan.smith@alstom.com