Brochures

Language
Date

Type

Brochures

You will find on this page all our brochures, product sheets and case studies.
Use the filters in the left column to refine your search.

PRIMA H4 - SBB – Case study – English

15/09/2016

Swiss leading operator SBB is in need of universally usable trains to meet its specific requirements. High performance and operational flexibility along with low operating costs are demanded. With the PRIMA H4 shunting and works locomotive, Alstom provides an answer to these technical and economical challenges.

Prima T8 Heavy freight - KZ8A - Case Study - English

15/09/2016

Kazakhstan Temir Zholy selected a PRIMA T8 heavy freight locomotive to modernize freight operations. With their leading-edge technology, PRIMA locomotives meet the highest functionality and safety standards. The KZ8A is capable to operate in extreme climatic conditions. Its reliability and availability are proven in service.

Pendolino – NTV – Case study – English

15/09/2016

NTV chose Alstom for the second time to supply and maintain a further 8 trains. For this second order, NTV acquired Pendolino train with proven reliability and high performance. The order for these new trains confirms NTV’s trust in Alstom’s competence in producing and maintaining high-speed trains.

PRIMA H3 - Metrans – Case study – English

15/09/2016

The PRIMA H3 locomotive for Metrans, based on a three-axle design, allows faster speeds, best in class traction effort and reduced track wear. The PRIMA H3 locomotive is a green component of the PRIMA locomotive range and reduces gaz and noise emissions significantly.

PRIMA M4 - KZ4AT - Case study - English

15/09/2016

Kazakhstan Temir Zholy selected a PRIMA M4 multi-purpose locomotive to enable seamless passenger operations. With their leading-edge technology, PRIMA locomotives meet the highest functionality and safety standards. The KZ4AT is capable to operate in extreme climatic conditions. Its reliability and availability are proven in service.

HealthHub for the infrastructure - Reims - Case study – English

15/09/2016

Alstom further optimizes infrastructure maintenance for Reims’ tramway line with the implementation of HealthHub™ and its Track & CatenaryTracer™ devices: Combining data analytics and innovative monitoring tools which allow the collection of accurate and reliable data from the infrastructure.

Pendolino – Virgin trains – Case study – English

15/09/2016

Virgin Trains chose Alstom to design, build, extend and maintain its Pendolino fleet. This 15 year collaboration enabled Virgin to significantly increase the number of passengers on the West Coast Main Line and continues to set new standards in their travelling experience.

Pendolino – Product sheet – English

15/09/2016

With a return on experience of more than 3,000 PMMs since 1999, Alstom brings you unsurpassed PMM expertise and track record in rail transport, across the spectrum of train types.

Maintenance WCML - Case study – English

15/09/2016

“Our customer service success at Virgin Trains is heavily dependent on the relationship with our key partners. Alstom has consistently gone beyond the call of duty to help us achieve the performance that has attracted record customer numbers and customer satisfaction scores. We are grateful for that support and partnership." Tony Collins, former CEO Virgin Trains

Prima Multi-purpose - Product sheet - English

20/06/2016

The PRIMA Multi-Purpose is a modular and flexible locomotive, designed for cross-border itineraries and to give freight and passenger train operators and their customers the performance and safety they expect.