Tapping into the huge potential of tidal and wave energy
Ocean energy is a major growth area in renewable power, and we’re committed to developing it to the fullest.
More about ocean energy
Suitable for all offshore conditions, our offshore 6 MW direct drive wind turbine combines proven technology and innovation. Building on our unique ALSTOM PURE TORQUE™ technology, it provides the high yield and uncompromising reliability that will lower the cost of offshore energy.
More about offshore wind
Alstom offers complete and efficient gas power generation solutions in the field of both components and turnkey power plants.
More about gas power
Solar power is a relatively young and growing industry, and one we believe is worth investing in.
That’s why in 2010 we cemented our partnership with BrightSource Energy Inc, so we can bring you more than 30 years’ expertise in generating solar power.
More about solar power
Carbon Capture and Storage (CCS) is an essential technology to address the climate change challenge.
More about carbon capture
06/02/2012
Alstom to provide electro-mechanical equipment and technical services for Song Bung 4 hydropower project in Vietnam.
02/02/2012
Russian-French joint venture Alstom-Atomenergomash (AAEM) has signed an agreement to supply turbine island equipment for units 1 and 2 of the Baltic nuclear power plant in Kaliningrad region, which are to be commissioned in 2016 and 2018 respectively.
31/01/2012
Alstom,worldwide leader in the production of hydropower equipment and services, has been awarded a contract worth above €20 million by Chinese engineering firm Sinohydro Corporation Ltd to provide key engineering equipment to the new Itezhi-Tezhi hydroelectric dam in Zambia. The contract was signed on 9 September 2011.
24/01/2012
Alstom and Drax announced today that industrial gases provider BOC will join them as a co-developer on the 426 MW oxy-fired carbon capture and storage (CCS) project currently under development at the Drax site in North Yorkshire.
17/01/2012
Alstom and the leading Scottish marine developer SSE Renewables have signed a new joint venture agreement to develop the Costa Head Wave Project, an up to 200 Megawatts (MW) wave energy site located north of mainland Orkney, in The Crown Estate’s Pentland Firth and Orkney Waters Strategic Area.
05/01/2012
Alstom has been awarded a contract worth approximately €50 million by utility Hydro-Québec to modernise the Robert-Bourassa generating facility in Canada, bringing a substantial increase to the plant's efficiency.
02/01/2012
Alstom is the leader of a consortium, including Orteng and Camargo Correa, selected by Cemig (Companhia Energética de Minas Gerais) to refurbish the São Simão hydro plant, Cemig’s most powerful facility, located in Paranaíba river, between Goiás and Minas Gerais States.
26/12/2011
Alstom, a global leader in power generation equipment and services, has signed a close to €50 million contract with China State Development and Investment Corporation (SDIC), to supply 2x660MW Steam Turbine Generator units for a fossil fuel power plant in Xinjiang Uygur Autonomous Region, China.
12/12/2011
Patrick Kron, Chairman and Chief Executive Officer of Alstom, and the Iraqi Vice Minister of Electricity, His Excellency Salam Kazzaz, signed on 11 December, in the presence of His Excellency Karim Aftan El Jumaily, Minister of Electricity, a contract worth approximately €400 million to build the 728 MW Al Mansuriya gas-fired power plant in the Diyala Governorate, northeast of Baghdad.
05/12/2011
Alstom has been awarded a contract worth approximately €900 million by Elektrownia Rybnik S.A. (ERSA) to supply the core power generation equipment for a new 900 MW coal-fired power plant to be built at the Rybnik site in Poland.
13/02/2012
Vadodara, in the state of Gujarat, is a centre of excellence both for hydro power generation and power transmission as well as underline Alstom’s commitment to India’s long-term economic growth.
03/02/2012
Alstom will participate at Coal-Gen Europe in Warsaw, Poland. Renowned industry experts and leading technologists from the coal-based powered generation industry come together to pave the way for a cleaner energy future.
26/01/2012
Leaders from across the global power generation industry are gearing-up for 2 days of intense discussion on technologies that are paving the way for a cleaner energy future.
25/01/2012
A selection of key 2011 Alstom's milestones related to its power generation activities: from renewable energy to fossil power generation.
Alstom amongst the thought leaders at the World Future Energy Summit.
16/12/2011
Alstom highlighted the role of business in addressing the climate change challenge at the 17th Conference of the Parties (COP17) to the United Nations Framework Convention on Climate Change (UNFCCC), which is being held in Durban from November 28 to December 9, 2011.
14/12/2011
Continuation of the Clean Development Mechanism (CDM) by Gwen Andrews, VP Environmental Policies & Global Advocacy, Asia & Oceania, Alstom.
30/11/2011
A 55-year partner for power generation in Brazil, Alstom today unveiled its first wind turbine assembly facility located in Camaçari in the state of Bahia.
29/11/2011
Asia focus sees heating element production line opened in India to meet local demand for Alstom technology
25/11/2011
Alstom at EWEA Offshore 2011, Amsterdam – Haliade 150-6MW: assembling the prototype.
Suitable for all offshore conditions, our 6 MW direct drive wind turbine combines proven technology and innovation.
Offering lower cost of electricity for the 60 Hz markets.
Answering 50 Hz markets' today's and tomorrow’s flexibility needs.
Alstom is currently focussing on to two main categories of CCS, Oxy Combustion and Post Combustion Capture.
Latest news, events, pictures and videos - Keep in touch with us!
Watch our videos on YouTube and subscribe to our channel!