Aller au contenu principal

Alstom in Kazakhstan

A major contributor to the rail industry in the region
Contact Alstom in Kazakhstan
12 Samal, BC «Astana Tower»
Astana
010000
+7 (7172) 62 07 40

A major contributor to the rail industry in the region

Alstom is present in Kazakhstan with more than 600 people, two Joint Ventures and two plants, one in Astana for locomotives manufacturing and maintenance; and KazElectroPrivod in Almaty for the production of point machines. Alstom is the only manufacturer of electric locomotives and point machines in the Central Asian and Caucasian region and a major contributor to the revitalisation of its rail industry and the development of its economy. 

Kazakhstan is an important hub linking Europe, Middle East, Asia and Russia through the new Silk Way. With around 16,000 km of track, the Kazakh railway network is the world’s third biggest network using the 1,520 mm track gauge and represents a substantial market for maintenance activities. 

Alstom’s sites in Kazakhstan

  • EKZ JV in Astana 

    Alstom entered the Kazakhstan’s railway market in June 2010 together with its Russian partner Transmashholding (TMH), by laying the first stone of the EKZ facility in order to build locomotives for the Kazakh network. The joint company was held by Alstom (25%), TMH (25%) and Kazakh Railways (50%). Alstom, EKZ, TMH and KTZ had signed a contract for the supply of 200 Prima T8 (KZ8A) and 95 Prima M4 (KZ4A) locomotives. The EKZ plant was inaugurated in 2012. In February 2016 Alstom increased its stake to 50% and in December 2017 signed an agreement with KTZ to acquire their 25% stare, which make Alstom majority shareholder in EKZ.

    The freight locomotives are now fully assembled at EKZ, the full assembly of passenger locos will start in 2019. 

    EKZ employs 420 people and is working on supplying and maintaining the Prima electric locomotives ordered by KTZ for 2020. As of April 2018, 48 KZ8A freight locomotives and 20 KZ4AT passenger locomotives are already in commercial operation on Kazakhstan’s rail lines.

  • KEP JV in Almaty

    KEP was formed in 2013 and was awarded a €90 million contract for the supply of 10,000 point machines to KTZ. Today KEP is owned 50/50 by Alstom and Special Oil Projects. With a total surface of 2,870m2, KEP employs 50 people and is working on supplying the point machines P80 to KTZ. As of April 2018, 2,636 point machines have been in commercial operation and have proven to be reliable and suitable for Kazakhstan’s rail lines. 

    Alstom’s P80 is a wayside electromechanical point machine designed to operate with no need of periodic maintenance while providing the highest level of safety. 

  • Repair center in Astana

    The corrective and overhaul preventive works, including spare parts and repairing of traction and brake systems, for the Prima T8 (KZ8A) and Prima M4 (KZ4AT]) locomotives will be performed there for a period of 25 years

  • 600
    employees (including JVs)
  • 2
    manufacturing plant, 1 depot, 1 repair center and 1 office
  • 2636
    point machines P80 in operation
  • 38
    million kilometers of commercial service of Prima T8 (KZ8A )& Prima M4 (KZ4AT)

On-going projects in Kazakhstan

  • Freight and passenger locomotives

    Freight and passenger locomotives

    295 locomotives to be supplied to the Kazakhstan Railways (KTZ) – 200 freight locomotives Prima T8 (KZ8A) and 95 passenger locomotives Prima M4 (KZ4AT).

  • Point machines

    Point machines

    10,000 point machines P80 to be supplied to the Kazakhstan Railways (KTZ) over a 10-year period starting from 2013.

  • Maintenance

    Maintenance

    Full maintenance and major overhaul of 27 passenger locomotives KZ4Ac, 200 Prima T8 (KZ8A) and 95 Prima M4 (KZ4AT) during 25 years.

Working at Alstom in Kazakhstan

Have a look at our vacancies